C & D Operating Procedures
1. The construction and demolition rate will be $26.00 plus $8.75 assessment fee for a total of $34.75 per ton.
2. All C&D loads must be screened at the new C&D cell as it arrives.
3. An attendant will be on duty at the site to screen loads and clarify if it is C&D waste.
4. Attendant will contact the scale house to inform weighmaster of the type of material and the weighmaster will apply the appropriate rate.
5. Loads containing ANY material other than C&D will be required to pay the regular rate of $41.75 per ton and must be disposed of in the proper place.
C&D MATERIAL DEFINITION
Any and all materials used for the construction or demolition of a dwelling or structure, which may include:
shingles, wood, siding, concrete, rock, carpet, tile, lineouleum, dry-wall, paneling, light fixtures, wiring, associated electrical products, sinks, comodes and tubs, plumbing products, soffit, facia and guttering, cinder blocks, brick, mortar, trim and moulding, wall paper, ceiling tile, heating and cooling ducts, cabinets, shelves, water and sewer pipes, rebar, insulation, doors and windows.
Latest News
11/19/2011New Web SiteThe RCSWA is pleased to announce the release of its new web site. The new modern look is straight-forward in its easy-to-use design. Find our hours of operations is listed right on the home page now, with TODAY's schedule displayed for quick reference. Access to our online store LAST CHANCE MERCANTILE...
More
Did You Know...
Either use one compass or 3 compasses because if 2 compasses disagree you still don't know where to go.
We have coarse unbagged mulch available - Free to load yourself or the RCSWA will load the coarse mulch for $5.00 per bucket load. RCSWA assumes no responsibility for any damage to vechicle.