CONSTRUCTION AND DEMOLITION OPERATING PROCEDURES
1. The construction and demolition rate will be $26.00 plus $8.75 assessment fee for a total of $34.75 per ton.
2. All C&D loads must be screened at the new C&D cell as it arrives.
3. An attendant will be on duty at the site to screen loads and clarify if it is C&D waste.
4. Attendant will contact the scale house to inform weighmaster of
the type of material and the weighmaster will apply the appropriate
rate.
5. Loads containing ANY material other than C&D will be
required to pay the regular rate of $41.75 per ton and must be disposed
of in the proper place.
C&D MATERIAL DEFINITION
Any and all materials used for the construction or demolition of a dwelling or structure, which may include:
shingles, wood, siding, concrete, rock, carpet, tile, lineouleum,
dry-wall, paneling, light fixtures, wiring, associated electrical
products, sinks, comodes and tubs, plumbing products, soffit, facia and
guttering, cinder blocks, brick, mortar, trim and moulding, wall paper,
ceiling tile, heating and cooling ducts, cabinets, shelves, water and
sewer pipes, rebar, insulation, doors and windows.
|